Anaheeta Homes

Looking For A Right Partner To Help Sell | Buy | Rent a Property? Look no further for genuine, transparent & professional advice from the experts.

Contact Info

307-Anaheeta Homes, JMD Galleria, Sohna Road, Opp. Malibu Towne, Sector 48, Gurgaon- 122001
info@anaheetahomes.com
+91-72729 59516
+91-98101 49865

Follow Us

Old Gurugram Metro Phase-2: Underpasses will be built at these 5 places, GMRL has asked for maps

Old Gurugram Metro Phase-2: Underpasses will be built at these 5 places, GMRL has asked for maps

August 20, 2025 Admin

The Old Gurugram Metro Phase-2 project is a significant step towards improving connectivity and easing traffic congestion in the city. Gurugram Metro Rail Limited (GMRL) has planned multiple developments under this phase, including the construction of five key underpasses at busy locations. These underpasses will help reduce traffic jams, provide safer crossings, and ensure smoother travel for commuters. By requesting maps and layouts from local authorities, GMRL aims to finalize the Detailed Project Report (DPR) soon.

The metro network in Gurugram is expanding rapidly, bringing new hopes for better connectivity and reduced traffic congestion. For the residents of Old Gurugram, the upcoming Old Gurugram Metro Phase-2 is nothing less than a big development milestone. As part of this project, five major underpasses are planned to ease traffic movement and provide safe passage for commuters. Recently, GMRL (Gurugram Metro Rail Limited) has requested detailed maps and technical layouts from local authorities to move this project forward.

5 Underpasses planned in Old Gurugram

The proposed underpasses will be built at five key locations in Old Gurugram. These spots have been chosen because of heavy traffic flow and congestion, which is expected to increase further once the metro corridor becomes operational. The construction of underpasses will not only help vehicles move smoothly but will also ensure safer and faster access for pedestrians and metro passengers.

GMRL has asked for maps

To begin the process, GMRL has officially asked the district administration and municipal authorities to submit layout plans, land details, and technical maps for the underpasses. Based on these inputs, a Detailed Project Report (DPR) will be finalized. Once the DPR is ready, the tender process will start, and construction work will be initiated within a fixed timeframe.

Why are these underpasses important?

Gurugram is one of the busiest hubs in the NCR region, with thousands of commuters traveling daily for work, business, and personal needs. Old Gurugram, with its residential colonies, government offices, and crowded markets, faces major traffic bottlenecks. Underpasses will play a crucial role in:

  • Reducing traffic congestion

  • Improving road safety for both pedestrians and vehicles

  • Saving travel time

  • Ensuring better connectivity between metro stations and nearby localities

Benefits for local residents

Once completed, these underpasses will provide several long-term benefits to the people of Old Gurugram:

  • Seamless and congestion-free travel

  • Safer crossings for pedestrians

  • Improved accessibility to metro stations

  • Reduced pollution due to smoother traffic flow

Conclusion

The Old Gurugram Metro Phase-2 project is a significant step towards strengthening the city’s infrastructure and public transport facilities. GMRL’s decision to build underpasses at five critical points will enhance the overall commuting experience and ensure that the metro expansion truly benefits the people of Old Gurugram. With efficient planning and timely execution, residents can look forward to a future with modern, safe, and hassle-free connectivity.


Old Gurugram Metro Phase-2 Underpasses in Gurugram GMRL Metro Project Gurugram Gurugram Metro Expansion Gurugram Traffic Solutions.
Properties
500
+
Properties Listed
Properties
5
+
Locations Covers
Properties
10
+
Expert Agents
Properties
100
+
Properties Sold
Enquire Post Require WhatsApp Call
Call WhatsApp Site Visit Enquire